House reconstruction

House reconstructions

Complete renewal and modernisation of existing properties.

From foundations to roof

A house reconstruction can include foundation repair, roof renewal, installations, windows, facades, layout changes and full finishing works. The approach is always individual and depends on the actual condition of the property.

Planning and execution

Before the work starts, we visit the property, discuss goals and prepare a phased plan, cost estimate and indicative timeline. Execution then proceeds in stages with constant communication.

Documentation and permits

Depending on the scope of intervention, notifications or permits may be required. We can help with that process or coordinate the work with your designer.

Project duration

A full reconstruction of an average family house usually takes 3 to 6 months, depending on the scope and technical condition of the property.

What a reconstruction can include

Foundation repair and waterproofing
Roof renewal or replacement
Changes to load-bearing and partition walls
New electrical network
New water supply and drainage
Heating installation
Replacement of windows and exterior doors
Interior and exterior insulation
Facade and exterior surfaces
Bathroom and kitchen renovation
Floor finishes and wall finishing
Complete interior arrangement

What is the clearest next step for your reconstruction?

Open contact and choose the most practical follow-up path for your house reconstruction. If you need quick coordination, call us right away.

Choose the next step that fits your project stage

Continue via contact

Best when you want to choose the right follow-up channel for this service.

Call now

Best for quick coordination, a callback, or arranging a site visit.

Send a detailed enquiry

Best when you already have photos, location details, or a clear work brief.

Clarify the scope first

Best when you are still narrowing down the work and want a first orientation.